Flandres Total Refinery

  • Client

    Total

  • Services

    Studies and plans (feasibility/basic/detailed) - supplies

TOTAL France entrusted NOX Group with carrying out studies and conducting their project “STRIPPEUR BP” for acid water in the refinery in Flandres at DUNKERQUE (59).

Conducting the project and the strategies already put in place meant that the following objectives could be reached:

  • Work was kept to a minimum on site thanks to a construction strategy (a ball for loads in the form of a skid) and by developing 3D studies;
  • Carrying out the project during the big production shutdown in 2010;
  • Integrating the site constraints (HSEQ policy), working in one service unit;
  • Defining works contracts and contracts for supplies before and during production shutdown;
  • Working out a detailed schedule for activities;
  • Anticipating ordering critical equipment (dry cooler and loading ball) for all deliveries on site as early as possible.