Elengy entrusted NOX Group with their project for renovating the Montoir Methane terminal in Brittany.

NOX conducted feasibility studies, basic studies, detailed studies, budget development, purchasing, supervising work and getting everything up and running.

Today, the production capacity of the Montoir-de-Bretagne site allows Elengy to load 18 trucks per day compared with 12 previously. An increase made possible thanks to the development work carried out on the facilities and the optimization of the loading schedule.